A |
Initiatory Professional Design Works & Services |
1 |
Home styling consultation & space planning |
2 |
Design concept proposals & Realistic 3D perspective drawings |
3 |
Selection of colours, materials & accessories |
4 |
Site inspection / Work schedule |
5 |
Project Management & Site Supervision |
6 |
2 year Warranty with Guaranteed After Sales Service |
B |
Masonry Works |
7 |
Supply labour & materials to lay selected 600 x 600 homogenous floor tiles c/w skirtings @ living & dining. (Tiles @ $3.00/sq. ft.) |
8 |
Supply labour & materials to lay pre-packed cement for screeding @ all bedrooms. |
9 |
Supply labour & materials to lay selected designs VINYL flooring c/w laminated skirtings @ all bedrooms. |
10 |
Construct 50-60mm kitchen cabinet base, fridge & washing machine base c/w side & full tiling finish respectively. |
11 |
Construct 50-60mm(H) shower kerb c/w tiles finish @ master & common bathroom. |
C |
Plumbing Works |
12 |
Install outlet (PVC) pipes for kitchen sink. |
13 |
Supply labour to install 1 no. of storage or 2 nos. of instant water heaters @ 2 nos.of bathrooms. |
14 |
Supply labour to install 2 sets of bathroom accessories @ 2 nos.of bathrooms. |
15 |
Supply labour to install 1 no. of kitchen sink & tap. |
D |
Ceiling Works |
16 |
Construct false ceiling or L-Box with cove holder @ living & dining. |
17 |
Construct false ceiling @ foyer. |
18 |
Construct false ceiling @ passageway. |
E |
Carpentry Works |
19 |
Design, fabricate & install top & bottom kitchen cabinet (20ft) in solid-ply c/w selected high quality grade laminate finish. (ABS trimming & standard soft |
|
closing hinges, cutlery tray, 1 chest of drawers, 1 pc of hydraulic system glass panel door & stainless steel dish rack) |
20 |
Install selected solid surface (10ft) for kitchen worktop c/w selected back splash & front profile. |
21 |
Supply labour to install 1 set of kitchen hood & hob. (Appliances provided by owner.) |
22 |
Supply labour to install 1 unit of oven. (Appliance provided by owner.) |
F |
Painting Works |
23 |
Painting of whole unit internal walls & ceiling (with sealer) using ICI / NIPPON Emulsion & Matex paint. |
24 |
Painting of whole unit doors & door frames using ICI / NIPPON Emulsion paint. (if requires) |
G |
Miscellaneous Works |
25 |
Haulage of related materials & items during renovation works. |
26 |
Provide PVC corrugated paper for floor protection. |
27 |
Chemical & general washing upon completion of works. |
28 |
Disposal of debris during & after renovation works. |