Kitchen & 2 Nos. Of Bathrooms
Kitchen & 2 Nos. Of Bathrooms
A | Initiatory Professional Design Works & Services |
1 | Home styling consultation & space planning |
2 | Design concept proposals & Realistic 3D perspective drawings |
3 | Submission of documents & application for HDB Renovation Permit |
4 | Selection of colours, materials & accessories |
5 | Site inspection / Work schedule |
6 | Project Management & Site Supervision |
7 | 2 year warranty with guaranteed after sales service |
B | Hacking & Demolition Works |
8 | Hack existing wall & floor tiles @ kitchen. |
9 | Hack existing wall & floor tiles @ 2 nos. of bathrooms. |
10 | Hack any possible existing kitchen concrete sink support. |
11 | Dismantle existing top & bottom cabinets @ kitchen. |
12 | Dismantle of existing water pipings @ kitchen. |
13 | Dismantle of existing gas pipings @ kitchen. |
14 | Dismantle existing bathroom doors & door frames @ 2 nos. of bathrooms.. |
15 | Dismantle of existing piping, WCs, shower screens, sanitary wares & bathroom accessories @ 2 nos. of bathrooms. |
C | Masonry Works |
16 | Supply labour & materials to lay waterproofing on affected floor area after hacking @ kitchen & 2 nos. of bathrooms. |
17 | Supply labour & materials to lay selected 300 x 600 non-slip homogenous floor tiles @ kitchen & 2 nos. of bathrooms. (Tiles @ $3.00/sq. ft.) |
18 | Supply labour & materials to lay selected glossy ceramic / homogenous wall tiles @ kitchen & 2 nos. of bathrooms. (Tiles @ $3.00/sq. ft.) |
19 | Construct 50-60mm kitchen cabinet base, fridge & washing machine base c/w side & full tiling finish respectively. |
20 | Construct 50-60mm(H) shower kerb c/w tiles finish @ master & common bathroom. |
D | Plumbing Works |
21 | Install inlet (stainless steel) extension pipes @ kitchen sink, washing machine & 2 nos. of bathrooms. |
22 | Install outlet (PVC) pipes for kitchen sink, washing machine & 2 nos. of bathrooms.. |
23 | Install wash basins, taps, WCs, rain showers @ 2 nos.of bathrooms. |
24 | Supply labour to install 1 no. of storage or 2 nos. of instant water heaters @ 2 nos. of bathrooms. |
25 | Supply labour to install 2 sets of bathroom accessories @ 2 nos.of bathrooms. |
26 | Supply labour to install 1 no. of kitchen sink & tap. |
E | GLASS & ALUMINIUM WORKS |
27 | Install 3 ft aluminium PD bi-fold doors c/w selected PVC panels @ 2 nos.of bathrooms. |
F | Carpentry Works |
28 | Design, fabricate & install top & bottom kitchen cabinet (20ft) in solid-ply c/w selected high quality grade laminate finish. (ABS trimming & standard soft |
closing hinges, cutlery tray, 1 chest of drawers, 1 pc of hydraulic system glass panel door & stainless steel dish rack) | |
29 | Install selected solid surface (10ft) for kitchen worktop c/w selected back splash & front profile. |
30 | Supply labour to install 1 set of kitchen hood & hob. (Appliances provided by owner.) |
31 | Supply labour to install 1 unit of oven. (Appliance provided by owner.) |
G | Miscellaneous Works |
32 | Haulage of related materials & items during renovation works. |
33 | Provide PVC corrugated paper for floor protection. |
34 | Chemical & general washing upon completion of works. |
35 | Disposal of debris during & after renovation works. |